top of page

Recent Projects where PSS dedication have aided our clients:

Positive Survey Solutions’ knowledge, broad experience and willingness to embrace modern technology have proven to ensure efficiency for a vast array of Survey projects. Using a combination of our Robotic Theodolites, GPS receivers and Laser Scanner, PSS has all the capabilities to provide a positive solution for all of your Projects’ survey requirements.

HEX GPS Survey Control
Kooragang Island Water Scheme
Laser Scanner Survey
Hunter Expressway (M15) Control Upgrade - Kurri Kurri to Belford (27km) 

 

PSS was contracted by AbiGroup to assist in reinstating the state control network disturbed by construction of the Hunter Expressway.

 

Under liaison with Land and Property Information (LPI) and Roads & Maritime Services (RMS), PSS designed a survey to meet the standard of the LPI for the 32 new permanent marks to be recorded in the Survey Control Information Management System (SCIMS).

 

PSS were responsible for overall survey design and methodology for both levelling and a GNSS network over the 27km project scope.

 

AbiGroup completed all levelling survey work based on PSS survey design, while PSS performed all GNSS work including a preliminary network adjustment for submission to LPI.

Kooragang Island Water Scheme - Hunter Treatment Alliance - Mayfield West Water Treatment Plant

 

Construction of a reverse osmosis water treatment plant by HTA for Hunter Water Corporation at Steel River, Mayfield West.

Project included various construction activities including:

- main plant building concrete, drainage and electrical conduits

- concrete footings for 5 above ground steel tanks

- 5 pumps stations and/or pads, concrete and electrical

- large concrete chemical bunds

- underground piping from 100mm to 750mm

- stormwater drainage above and below ground

- concrete access way, kerbing and pavement

- amenities and education annex buildings

BOC Gases, Koorangang Island - Laser Scanning and Detail Survey

 

Laser scanning and detail survey for plant upgrade merging scanning and traditional survey techniques.

 

Scope included laser scan and 3D modelling of existing tanks and specific service piping plus detail survey of surface structures, access ways and services.

Hunter Expressway Construction Survey
Hunter Expressway (M15) Construction – AbiGroup

 

PSS assisted AbiGroup Surveyors with survey for the construction of 27km of dual carriageway expressway, 4 interchanges and associated ramps and local road realignments.

 

The variety of survey included:

- bulk earthworks setout and conformance

- blasting surveys

- machine guidance

- drainage setout and conformance

 

- large network control surveys

- pavement setout and conformance

- roundabout construction

Waste Transfer Station - Tea Gardens

 

PSS created 3D models for machine guidance for the onsite bulk earthworks and established a control network for calibration of the machinery. In the construction of the Waste Transfer Station PSS assisted with the design & setout of associated roads, drainage, infrastructure and plant.

Tattersalls on Watt, Newcastle - 8 Level Residential apartment block - Base Build

 

PSS are providing all Survey requirements from intial boundary determination through to construction setout and final strata plan of 53 apartments.

Cardiff Link Ramp - Cardiff Railway Station - Burtons Contractor

 

PSS has been assisting Burton Contractors in the construction of the Cardiff Railways Station upgrade.

Boral Asphalt Plant Upgrade, Carrington - Construction Survey - Thiess Services

 

Setout for construction of new plant footings, weighbridge, covered storage building, drainage tanks and access ramps.

 

PSS also setup machine guidance infrastructure and 3D models for site regrading and pavement construction.

Rural Road Detail
Star Hotel Site Detail Survey & 3D Wireframe Measure Up

 

Full interior measure up to generate 3D wireframe model for architectural design along with detail survey for exterior structures and services.

 

Survey combined laser scanning, traditional detail survey and basic tape measurements.

Stockpile Volume Surveys - Grain & Coal - SGS Australia

 

Volumetric Surveys on Wheat storage facilities throughout Rural NSW, Queensland, Victoria & South Australia to determine volumes by calculation.

 

Additionally, PSS continue to provide biannual reports for coal stockpile volumes at several Power Stations in the Lithgow region for SGS Australia.

Mayfield to Broadmeadow Sewer Main line construction - AJ Lucas 

 

PSS undertook the Survey setout, ‘As-Built’ for construction and re-design of gravity and rising main sewer lines from Mayfield to Broadmeadow. Preparation of final Work As Executed plans for Hunter Water Australia.

Bucketts Way Road Corridor Survey

 

Craven to Taree via Gloucester, total surveyed length approximately 30km.

17 separate project areas of rural road detail spread over 90km of the Bucketts Way.

Marine Construction Setout
TEJV Rail Corridor - Newcastle to Casino

 

Land Acquisition Surveys of multiple parcels of Torrens and old system land for rail corridor widening along the Main Northern Railway.

KEP K7 Wharf Construction and Transfer Houses refurbishment

 

A 330m wharf, rail and conveyor extension with associated drainage structures.

 

PSS was involved in survey for marine and land piling, precast concrete installation, conveyor gantry manufacture, installation and alignment, drainage washout and detention structures, rail installation and general earthworks. 

 

Control & Detail Survey of conveyor belts, transfer houses & proposed railway corridor.

bottom of page