Positive Survey Solutions has been engaged to undertake the Survey setout  of the new Bulk Liquids Berth at Mayfield 7 in the Port of Newcastle for Waterway Constructions $40m project on behalf of Stolthaven Australia .

Remediation Survey

Mayfield 7 Project Site prior to construction

Mayfield 7 Bulk Liquids Berth Project

Stolthaven Australia proposes to construct and operate a new, purpose built berth at the Mayfield 7 (M7) site as nominated on the approved Port of Newcastle ‘Concept Plan’ for development on the former BHP steelmaking site at Mayfield. The berth is currently approved for use as a berthing facility only, however subject to further approvals, future development at the site will see the construction and installation of bulk liquids handling infrastructure on the berth to facilitate the transfer of products to and from vessels and the adjacent bulk liquids terminal.

PSS involvement in the construction and associated infrustructure of the Mayfield 7 Project currently comprises the setout and conformance of following key features:

 

  • Construction of combi sheet pile caisson approximately 275m long and 20m wide on the south side of the South Arm of the Hunter River;

  • Installation of berthing and mooring infrastructure.

The Barge arrives to site

The 1st of the King Piles in place

The first Piles are placed

Placement of the Piling Frame

Marine Piling is underway

Marine Piling is progressing well

Surveyor sets out the Marine Piling

PSS Surveyor Marine Piling Newcastle